Early autumn is a suitable time to renovate the bathroom, as the work can be completed before the cold season. To avoid delays and unexpected expenses, start by checking the installations, measuring the space, and setting the budget. Only then choose the finishes and shower area.

1. Check the installations and the condition of the bathroom

Before choosing the tiles or furniture, check:

  • the pipes, connections, and drain;

  • signs of damp or mold;

  • the room's ventilation;

  • the electrical installation and lighting;

  • the flatness of the walls and floor.

If you change the position of the shower, washbasin, or toilet, the installation changes must be completed before tiling.

2. Measure and plan the space

Note the bathroom dimensions and the positions of the door, window, pipes, and electrical outlets. Check the space required for furniture and access to the shower area.

In a small bathroom, a walk-in shower screen or a sliding door saves the space required to open a hinged door. Final measurements for glass products are taken after the floor and wall tiles have been installed.

3. Set the budget

Include installations, waterproofing, finishes, labor, the shower area, sanitaryware, and furniture in your budget. Keep a reserve of approximately 10–15% for repairs or additional materials.

Do not skimp on waterproofing and installations. These affect the safety and durability of the entire bathroom.

4. Choose the shower area before tiling

Decide early whether you want a walk-in shower, an enclosed enclosure, or a sliding door. The choice affects the position of the drain, the floor slope, and the size of the tiled surface.

For a bright look, the Aqua Roy Stainless steel walk-in screen has 8 mm toughened glass, limescale protection, and SS304 stainless steel hardware.

In a compact bathroom, the Aqua Class Stainless steel screen is available starting from 50 cm. Clear glass maintains a sense of spaciousness.

For a modern design, Aqua Roy Minimal Black combines 8 mm glass with black hardware. If you need additional protection against splashes, Glissando Simple Black, Mode model has a sliding door and does not take up space when opening.

5. Follow the order of work

The recommended order is:

  1. removing the old finishes;

  2. modifying the plumbing;

  3. preparing the surfaces and waterproofing;

  4. installing the floor and wall tiles;

  5. installing the sanitary fixtures and furniture;

  6. installing the shower screen or shower enclosure;

  7. sealing and final finishing.

The screen is installed only after the tiling is complete and the final dimensions have been checked.

Frequently asked questions

How long does a bathroom renovation take?

A complete renovation can take approximately two to four weeks, depending on the work required and the availability of materials.

When is the shower screen measured?

Final measurements are taken after the tiles have been installed, because the tiles and adhesive change the available dimensions.

What do you choose first: the finishes or the sanitary fixtures?

First, establish the plan, position, and dimensions of the sanitary fixtures. Choose the finishes afterwards, based on the final configuration.

Conclusion

Bathroom renovation starts with the plumbing, measurements, and a clear budget. Plan the shower area before tiling, use proper waterproofing, and follow the correct order of work.